気になったやつ
- 気になったやつ
- 23:00-01:00 Tuesday Session I
- 23:00-01:00 Wednesday Session I
- 23:00-01:00 Thursday Session I
- 02:30 (+1)-04:30 (+1)Thursday Session II
- 23:00-01:00 (+1) Friday Session I
関連draft一ミリも読んでないwgとかは結局聞かない可能性高いけど。
23:00-01:00 Tuesday Session I
IPv6 Operations
WebTransport
https://datatracker.ietf.org/meeting/114/materials/agenda-114-webtrans-01
23:00-01:00 Wednesday Session I
Media Over QUIC
23:00-01:00 Thursday Session I
QUIC
https://datatracker.ietf.org/meeting/114/materials/agenda-114-quic-00
WG Items
- 40 min - Open issues, updates to multipath QUIC. [slides] (TBD) - Mirja Kuehlwind
- 20 min - Open issues, updates to Acknowledgement frequency. [slides] (TBD) - Ian Swett
Other (aka "As Time Permits")
- 15 min - Quic Timestamps For Measuring One-Way Delays draft-huitema-quic-ts. [slides] (TBD) - Christian Huitema
- 10 min - Multicast Extension for QUIC draft-jholland-quic-multicast. [slides] (TBD) - Jake Holland
02:30 (+1)-04:30 (+1)Thursday Session II
HTTP
Active Drafts
See also the extensions listing
- 5 min - Summary of Alt-Svc side meeting
- 10 min - Cookies
- 10 min - ORIGIN H3
- 15 min - Retrofit Structured Fields
- 15 min - Signatures
- 15 min - QUERY
Other Topics
- 15 min - Resumable Uploads - Guoye Zhang
- 10 min - GeoIP - Tommy Pauly
- 10 min - Transport Auth - David Schinazi
- 10 min - METADATA - Bence Béky
Side Meetingあるらしい
19:00-20:30 - Wednesday - Salon 9
AltSvc, HTTPS RR and Friends
This session is focused on the space currently occupied by AltSvc and the HTTPS RR. The expectation is that it will produce proposals to take to the WG on Thursday regarding the scope of AltSvcBis and any additional work necessary.
- 10 min - Overview (slides) - Martin Thomson
- 10 min - AltSvcBis
- 10 min - An Alt-Svc Parameter and SvcParamKey for QUIC Versions
- balance - discussion
Path Aware Networking RG
15:35 | 85m | SCION Components Analysis (draft-rustignoli-panrg-scion-component) and open mic discussion | Nicola Rustignoli, Chairs |
17:00 | 15m | Overlay Routing Problem Statement, draft-deng-overlay-routing-ps | Geng Li/Shangling Deng |
17:15 | 15m | Separation of Data Path and Data Flow Sublayers in the Transport Layer, draft-asai-tsvwg-transport-review | B. Serracanta |
Separation of Data Path and Data Flow Sublayers in the Transport Layer,
draft-asai-tsvwg-transport-review
transport layer を Data Path と Data Flow に分けて考えるってdraft
23:00-01:00 (+1) Friday Session I
TCP Maintenance and Minor Extensions
Working Group Items
-------------------------------------------------
* Revised Cubic as PS
https://datatracker.ietf.org/doc/html/draft-ietf-tcpm-rfc8312bis
Speaker: Vidhi Goel
Time: 15 mins 30/120
* Proportional Rate Reduction for TCP
https://www.ietf.org/archive/id/draft-ietf-tcpm-prr-rfc6937bis-02.html
Speaker: Yuchung Cheng
Time: 15 mins 45/120
* AccECN updates
https://datatracker.ietf.org/doc/html/draft-ietf-tcpm-accurate-ecn-19
Speaker: Bob Briscoe
Time: 15 mins 60/120
* A YANG Model for Transmission Control Protocol (TCP) Configuration and State
https://www.ietf.org/archive/id/draft-ietf-tcpm-yang-tcp-07.html
Speaker: Mahesh Jethanandani (TBC)
Time: 10 mins 70/120
Other Items
-------------------------------------------------
* NG TCP Yang Model
Speaker: Gyan Mishra
Time: 15 mins 85/120
* TCP ACK Rate Request
https://datatracker.ietf.org/doc/html/draft-gomez-tcpm-ack-rate-request-05
Speaker: Carles Gomez (remote)
Time: 15 mins 100/120